История развития
2017-11
2017
Introduced IATF16949:2016 to replace ISO/TS16949:2009
The fit plant-wide Innovation Day was held.
2015-08
2015
Based on the Japanese customer engineering checklist as a standard, continuous improvement activities were carried out - (target 50.5 points 70 points within 3 yea, actual 89 points).
2012-05
2012
The mold manufacturing department was traferred from the fit factory to the second factory.
2011-10
2011
Introduced environmental management system ISO14001:(2004), and obtained the certificate in October.
Innovation Traformation:
Set up a task force and focus on molding automation (injection molding/special machines) and quality ipection automation (expanding the scale of AIM-automatic quality ipection machines).
2009-03
2009
Passed the factory ipection of Deo & ASMO Japan.
2008-10
2008
The production department was cut into AUTO, AM, LS, IPD, FKM, SST(EPDM) and NBR.
Passed JTEKT Japan's factory ipection.
2006-11
2006
Xiangbang completed the fit phase of the cotruction project, about 9,666 M², and started mass production in November 2006 (the cotruction area was 14,000 M² as of 2018).
2005-07
2005
A new joint venture company was established, mainly to produce large-volume injection mold products for automotive supplie.
The floor area of Xiangbang, the second factory in Xiamen, China: 56,000 M² (the floor area of the fit factory - Ruifeng: 12,664 M², cotruction area: 9,000 M²).
2004-06
2004
In March 2004, passed the certification of ISO/TS16949 (2002) by TUV. Received certificate on June 10, 2004.